St. Mary Medical Center Women’s Heart Center

We recently completed all the cabinetry and stone work for St. Mary medical center in the WHC. The Long Beach press telegram and the Gazette have published an article and we were mentioned as well as the other trades. You can view the article at http://www.gazettes.com/lifestyle/health/article_95c7e914-3f8d-11e0-80fb-001cc4c03286.html
Great start to 2011. We completed all the cabinets and counter tops in the equipment room, reception area, and  exam rooms. All the cabinets are finished in Brighten Walnut, with flat panel style doors and drawer fronts. The interiors are finished in industrial grade melamine. The pulls are from Top Knobs and we used the square bar pull in a brushed satin nickel finish. The counter tops are from Caesarstone "Rosemary" with a straight edge detail and cut outs for waste basket and a small integrated sinks. Chris Jenkins was the Project Manager and once again did an outstanding job.

Tuesday, February 15, 2011

Davis Residence

The Davis project started in early January and is close to wrapping up. The appliances were installed today and the sink was delivered. The only things left to do is install the sink and wait for the new pendant light to be delivered.



Here is the Davis project before picture. Notice the soffit and post in this picture. The removal of these items has really opened up their kitchen.



The project is complete and the customer is thrilled. The pendant light and sink have been installed and the customer is left to enjoy her newly remodeled kitchen. It was a pleasure working with these clients and we will miss seeing them everyday.