Thursday, October 27, 2011

Bathroom Remodel

This Bathroom Remodel was completed last week in Los Angles, CA. This dated ordinary bathroom was transformed into a modern masterpiece the customer is proud to call her own. The before pictures really depict what you might see when you walk into most homes here in CA. The after pictures showcase the modern style of this customer and set her bathroom apart from any other.



The counter top is a polished Blue Pearl Granite with a 1 1/2'' bullnose edge detail. The beautiful vessel style sink is made from a solid piece of  Black Absolute Granite. The vanity cabinet was custom made for this space with a beautiful hand selected finish and modern slab doors and drawers. The floor and wall tile are 12''x12'' Black Absolute granite with a honed finish and a glass Mosaic insert.


Thursday, July 7, 2011

Vetrazzo matched with Silestone

We made another customer happy last week when we installed their new kitchen counter tops.
The island is made with Vetrazzo a recycled glass surface. The customer selected the color Alehouse Amber with Patina. Vetrazzo is a incredibly durable and easy to maintain surface that is not only beautiful it is good for the environment.


The main counters in the kitchen are made with Silestone, a beautiful quartz surface. The customer selected the color Capri Limestone. We installed the counters with a 1 1/2'' square edge detail and a under mounted sink cut out. Behind the range we installed a large backsplash that looks beautiful and will really help make this area easy to clean. The only thing left to do is have the Range and hood installed and this kitchen is ready to use.

Monday, June 27, 2011

Silestone Life Series


We completed another counter top project in Long Beach, CA in the beautiful community of Bixby Knolls. This modern bathroom was designed by a local designer who utilized beautiful bright green counters to go with a custom tile design in the shower. We used Silestones Life Series color "Green Fun".  The unique shape was customized by the designer and gives the bathroom a bright open feel with a truly modern design.





Monday, June 20, 2011

New Long Beach Project.

We completed another renovation in the beautiful condominium complex Bixby Riviera, located in the Bixby Hill area of Long Beach, CA. This particular client did not want a complete kitchen and bath remodel, they wanted to upgrade their existing cabinets and flooring to give the home a fresh updated look. Here are a few pictures of the existing kitchen.

In the kitchen we removed the existing linoleum floor and installed new 12x12 porcelain tile on a straight pattern. We continued the porcelain tile into the entry area and the downstairs guest bathroom. We removed the existing florescent lights in kitchen, installed 6 recessed can lights, and repaired all drywall in the light well.  We demolished the existing tile counter tops and were able to save the existing tile backsplash in order to help the client stay within their budget. The client decided to go with Cambria, color "Darlington" for the counter tops. Cambria is a quartz surface made in the USA that is nonporous and nonabsorbent resisting stains such as coffee, tea and wine.



We provided and installed new faucets and angel stops in the kitchen, guest bathroom and master bathroom. In the bathroom the client went with Kohler Devonshire fixtures in the Oil Rubbed bronze finish. In the kitchen the client went with a Kohler Pull Down faucet in a Polished Chrome finish. We also provided and installed a new InSinkErator Invite Single Handle Hot Water dispenser in a chrome finish.

Friday, April 15, 2011

Kitchen Cabinet Refacing in Long Beach

At a local Belmont Heights home here in Long Beach, we installed new Cambria, Quartz countertops (color Caerphilly Green) onto the customer existing cabinets

The customer was so excited about the transformation of her countertops and how quickly we installed them that she asked us to give her a price for updating her existing cabinet boxes. In this particular case the customer has a painter coming in after us so we upgraded her doors and drawers to a Maple paint grade in a Shaker style. We also provided her with new concealed hinges and soft close drawer glides with new prefinished dovetail drawer boxes.
After completing the project the customer was so pleased with the outcome that she had one more project for us. She was unhappy with the existing over the range cabinet so she had us build a custom cabinet box to match the existing cabinet. Then we added custom crown molding to finish it off.

Tuesday, March 22, 2011

Rancho Los Cerritos Historical Site

We just completed a project for the City of Long Beach at the Rancho Los Cerritos Historic Site. Rancho Los Cerritos Historic Sites is a public museum open for tours, programs and events. The main house was built in 1844 and has been restored and preserved to reflect occupants and lifestyles from the 1860s-1880s.

Dynamic CTS was asked to fabricate a Carrera White Marble counter top. The City provided us with a remnant piece of marble from the 1800s that matched the Historic Site. We fabricated the stone by hand to match the edge detail used in those times.

We would like to thank the City of Long Beach for letting us have a small part in the preservation of this amazing site. We would recommend anyone who lives in the area to take a tour of this beautiful site.
http://www.rancholoscerritos.org/index.html

Friday, February 25, 2011

St. Mary Medical Center Women’s Heart Center

We recently completed all the cabinetry and stone work for St. Mary medical center in the WHC. The Long Beach press telegram and the Gazette have published an article and we were mentioned as well as the other trades. You can view the article at http://www.gazettes.com/lifestyle/health/article_95c7e914-3f8d-11e0-80fb-001cc4c03286.html
Great start to 2011. We completed all the cabinets and counter tops in the equipment room, reception area, and  exam rooms. All the cabinets are finished in Brighten Walnut, with flat panel style doors and drawer fronts. The interiors are finished in industrial grade melamine. The pulls are from Top Knobs and we used the square bar pull in a brushed satin nickel finish. The counter tops are from Caesarstone "Rosemary" with a straight edge detail and cut outs for waste basket and a small integrated sinks. Chris Jenkins was the Project Manager and once again did an outstanding job.

Tuesday, February 15, 2011

Davis Residence

The Davis project started in early January and is close to wrapping up. The appliances were installed today and the sink was delivered. The only things left to do is install the sink and wait for the new pendant light to be delivered.



Here is the Davis project before picture. Notice the soffit and post in this picture. The removal of these items has really opened up their kitchen.



The project is complete and the customer is thrilled. The pendant light and sink have been installed and the customer is left to enjoy her newly remodeled kitchen. It was a pleasure working with these clients and we will miss seeing them everyday.


Sunday, January 30, 2011

Welcome

Welcome to Dynamic Cabinets Tile & Stone.

We specialize in kitchen and bath remodeling from concept to completion. We assist architects, interior designers, general contractors, and home owners realize their design. We offer cabinetry for all budgets, styles and counter tops from quartz to natural stone. We provide quality product and service at competitive prices. Our superior and meticulous craftsmanship and on-time installations are a few of the qualities that distinguish us from our competitors.

Want to find out more about us please visit our website at www.dynamiccabinets.com/.